A great tennis court starts long before the surface goes down. Here's what's typically involved: Site preparation: clearing vegetation, removing existing surfaces and setting out the court. Groundworks: excavating, levelling and preparing the ground. Drainage: installing drains and forming falls so water runs off the
Four public tennis courts at Central Park in London have been refurbished, with R C Grant carrying out the groundworks. We stripped back the tired old surface and prepared a sound base for the new courts, setting the levels and falls needed for a long-lasting
R C Grant has completed the groundworks for Epping Rugby Club's new artificial rugby pitch, converting an existing grass pitch into an all-weather playing surface the club can use year-round. Our team handled everything below the turf: reduced-level excavation, a new pitch drainage system, a

